We make sure everything works as planned. We commission and test all equipment and installations and we monitor and participate in all trials and tests.
This includes initial test of dual fuel and electronic operated engines, mooring trials, FAT trial (Factory Acceptance Test) both main engine and auxiliary engines. Sea trials will typically comprise marine trials, DP/FMEA trials and AHTS/PSV proving trials.
On-board system commissioning and tests will include the marine systems, DP related systems, DP Black Box, Bow Loading System and AHTS/PSV related equipment as well as Ballast Water Treatment plants.
The final result is a vessel built to your exact specifications – delivered on time and with the certainty that the vessel is optimized for maximum lifespan, minimum warranty claims and unwanted downtime.